POSA: Pre-Occupational Site Audit

Service Overview

Our audits cover everything from geographical positioning to technical assessments, ensuring the site’s infrastructure aligns with your processes.
It offers peace of mind by verifying key infrastructure aspects of shortlisted sites, such as connectivity to main roads, secure entrances, suitable estate road widths for vehicle traffic flow, adequate docking yard space, essential utilities, hygiene facilities, and building vital specifications. We also ensure the site can accommodate modern warehouse equipment and systems.
A POSA helps you make an informed decision about infrastructure/facility choice and creates a list of technical requirements/indicated on drawings for the prospective landlord to address before occupying the warehouse.
Read More
A Pre-Occupation Site Audit (POSA) rationalises the choice of a new warehouse location on a multi-tiered criterion involving:
- Complete building specifications including flooring and services.
- Functional validation and suitability in reference to the industry requirement.
- External layout design and specifications that include entrances, estate roads, yards, aprons, common facility centres, signages, etc.
- Feasibility with available logistics infrastructure


How We Work?

01
Visit the selected warehouse building


02
Audit & Technical Evaluation based on a customised checklist of selected property


03
A Technical Deliverables document is prepared post-building audit

Service Benefits

Selecting a warehouse in the right location to enhance order fulfillment at cost-effective rates.

Choosing a warehouse that aligns with required functions, processes, and work requirements.



Prepare a detailed technical deliverable document which is shared with the developer to make the required changes to the structure to meet the client’s requirements forming the part of the lease agreement.